Main phases of repair works in the apartment.
How to begin repair of the apartment?
The first phase of the repair of old apartments is the destruction and taking apart firstly of the worn out walls and partition walls, eliminating the wall and ceiling finishing. This stage is among the most "unclean" phases of the repair.
One more amongst the most crucial and "dirty" works is the window block replacement. It is required to do this to start with because dirt and dust will be unallowable during following stages and it is forbidden at all to open windows during painting and wallpaper works (large drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is required to load them right away in polyethylene film and to cover windowsills in addition by the fiber board (in order to prevent scratches).
The following stage is wiring. Electrical wiring can be set up in walls or along the flooring. Circuitry is made inside the pipes to make sure electrical safety and increase reliability. The pipe secures electrical wiring from external damages and permits to change the wire entirely without breaking walls and flooring just by placing the new wire instead of the old one.
House Painting follows the circuitry. The frequent mistake throughout the synchronised conducting of such works takes place when workers forget to lay out among the cables and home painters have already plastered and ravelled the wall. As an outcome, extra works are required to seal chases after on the completed wall. The places of the feed switch and wall outlet location and their number must be thought-out in advance. The plan of power wiring is generally consisted of into the design project.
Later on the system must be prepared to service in case of failures. In addition to the circuitries, the telephone cable television and the television cable television are set out. The power cable television ought to not be laid out near the telephone and antenna cables to avoid sound pickup and disturbance. The most strange moment is laying out the television cable television. In order to make two (or 3) television set in the house the second cable television is often merely "strongly soldered" in parallel, so the cable television resistance is lowered. As a result, the screen quality is degraded, many programs can't be gotten and etc. In order to avoid such circumstance it is necessary to invite a specialist with special equipment. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-term procedure, that is why it is conducted simultaneously in all facilities, if it is possible. Delays are related to the technology. Each used layer of the plaster (or completing completing) must dry totally before the work will continue.
Works in sanitary arrangements and the kitchen begin concurrently with house painting. It is much better to meet so-called "filthy" operate in the first place and at the same time. In accordance with the strategy of the sanitary professional place welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then operates in sanitary plans are conducted according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the flooring. And at last other hygienic devices, mixers and accessories are mounted.
After wiring, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not installed during this phase in order to save their surface appearance. The surface puttying of walls is carried out concurrently. The technically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines moisture of the material.
The following stage is the process of fill. Fill can be made with different products-- from usual masonry cement-sand mix to self-aligning floorings. The benefit of the simple mix is its cheapness, the downside is that such mix is much harder lined up at the level and the final dry time of such fill is 40 days, only then the next stage of the work with floor can be performed, i.e. the period is too long. Self-leveling self-aligning floors are a lot more expensive, however more technological. Aligning takes place practically "instantly" i.e. fluid service of mix is poured out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have substantial time economy. The system "warm floor" is set up into the fill. If the so-called "damp processes" are inapplicable the technology of the dry lining up (the fill innovation) is utilized bases for floors with adjustable flooring battens are mounted.
After fill door boxes and door are set up. Installation of doors must take into the account thickness of future floor covering. After setup the door can be taken off its hinges and got rid of up until completion of repair or packed into polyethylene film to protect from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile must be laid on the absolutely dry overlay.

In properties where finish covering of the flooring is laminated floor covering or parquet stockpile, the regular wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned effect is connected just with such scrambling procedure when the fantastic amount of dust is produced. In spite of the truth that good flooring mills are geared up with the vacuum, the enough quantity of dust is precipitated on surrounding topics including walls. Dust is really acerbic and is terribly cleaned off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus commercial hot water solutions wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be thought about to be ended up. It is left only to set up the plinths, ornamental aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is needed to note that the sequence of works was noted in basic and can alter depending on the definite circumstance-- the number of rooms in property, your resources, peculiarities of the construction of the multilevel properties. It is based on common sense and every person efficient in analysis can independently create such a series.